Dedusting units No.3, 4, 5, 6. Design and survey works, software update.
The activities on design and survey, as well as updating software for automated control system of control board and installing HMI panel in control board cabinet were completed.
In accordance with the Technical assignment for operation of shiploader No.3 the new electric circuit diagrams, specifications and cost estimate sheets were elaborated, thus preparing the ground for implementing the operator panels on local control cabinets of dedusting units. The application software for operator panels controlling performance of electrical and mechanical equipment of dedusting systems was developed too.