JSC «Uralelectromed», «UMMC-Holding», the town of Verkhnyaya Pyshma, Sverdlovsk region.

19.09.2018

news_19_09_18
Extension of the existing field information network OTN.
In June, 2018 the second line of copper electrolysis plant with efficiency of 160 thousand cathode copper tons per year was put into service at JSC «Uralelectromed» (the UMMC holding enterprise). Basically the second line (in terms of technology and infrastructure) repeats the first one that was put into operation in 2012 with the field information network OTN.
To operate the both lines of the plant from one operator station the CJSC «ASC» specialists executed extension of OTN network for the second line. (Design, delivery, erection and start-up and commissioning works).

Метки:
To other news