Updating of electrical equipment of mine winder TSR-6.3×4.2/0.6.
The specialists of CJSC «ASC» jointly with specialists of JSC «Specialized Construction and Installation Administration» Tsvetmetnaladka» have finished works on updating of electrical equipment of mine winder TSR-6.3×4.2/0.6 for cage winding plant of «Combined cage and skip» shaft commemorating «The decade of Kazakhstan Independence». The activities on equipment updating included:
- development ofelectrical equipment design;
- supply of electrical equipment (armature circuit and field circuit thyristor converters, inductance chokes, protective devices);
- electrical installation of electric drive and control system including dismounting of old electrical equipment and mounting of a new one;
- start-up-and-adjustment of power and control electrical equipment;
- Customer’s staff training with respect to equipment operation, repair and maintenance.
The mine winder operates in the following modes:
- men hoisting;
- load lifting;
- shaft overhaul;
- oversize material.
The mounting/dismounting of equipment as well as start-up and adjustment works were fulfilled within a short time to reduce operational down times.