APCS for wagon unloading stations No.1 and No.2.
Under the contract with NANTONG RAINBOW HEAVY MACHINERIES CO., LTD — the company in the People’s Republic of China (hereinafter referred to as RHM), the JSC ASC engineers have completed the works on developing the working documentation on APCS for wagon unloading stations No.1 and No.2 of the mineral fertilizer transshipment complex in favor of the Customer – EuroChem TerminalCoal LLC, the Ust-Luga port.
The documents prepared as part of the «WD» stage for APCS (including the design documentation for production of low-voltage switchgear and controlgear assemblies) were issued in accordance with the terms of reference and agreed with the Russian and Chinese Customers.
The scope of works covered the electrical equipment for machines of: wagon positioners, hopper unloaders and belt feeders, transborders that deliver the wagons to haul tracks, wagon ejectors, centralized dedusting units of wagon unloading stations, wheel grippers and other equipment, being part of a wagon unloading system of wagon unloading stations.
Pursuant to the documentation set, the Customer, that is, RHM company, now manufactures in the territory of China about 150 units of the cabinet- and desk-type equipment that will be then forwarded and mounted in electrical room ER1 of the wagon unloading stations mentioned at the transshipment terminal of the Ust-Luga port.
The JSC ASC specialists are currently conducting the hot comprehensive testing of assembly units of WUS1 and WUS2 equipment, under conditions of voltage supply and idling of engines, prior to sending it to Russia.