Updating of automatic level crossing signaling system.
Relay system has been replaced by up-to-date microprocessor-based system «APC-ASC». New railroad crossing gates and signals are installed. «APC-ASC» system controls the crossing and shunting signals as well as railroad crossing gates of PASH-1 type; control is executed via crossing control desks.
Video surveillance feature is implemented on the rail crossing; the data are filed; remote control of the crossing is executed through fiber-optic link.
JSC «Ural foil», the town of Mikhailovsk, Sverdlovsk region.
27.01.2021