Automated control system for dedusting units.
Under subcontract with LLC «Polycom» the JSC «ASC» specialists have completed a range of commissioning works on updating software for automated control system of dedusting units No.3, 4, 5, 6.
In the course of works the visualization system (operator panel SIPLUS HMI TP2200 COMFORT 22") was set up locally on the cabinet for each dedusting unit, allowing the dockside workers to control and adjust operation of the units. At the same time there was performed debugging of the system for data transfer to central control station of port transshipment complex No.3 for PCS7 for troubleshooting of dedusting units and warning of coal complex operators.