News
«Vostochny port», the town of Nakhodka, the settlement of Vrangel, Primorski Krai.
Power equipment and process control system for the shiploader No.3 car dumper (the 3rd stage).
Certificate of partnership from Siemens and ETM companies for WinCC Open architecture (WinCC OA) system.
The certificate confirms relevant competence of CJSC “ASC” and grants the right to use this system in company projects.
NON-STATE PRIVATE INSTITUTION FOR HIGHER EDUCATION «UMMC Technical university», the town of Verkhnyaya Pyshma, Sverdlovsk region
Fitting out the «Electric power accounting and quality control systems» laboratory with test benches.
JSC «Siberian service company», Moscow.
Retrofitting of electric drives for main machines and automated control system of drilling rig BU 4500/270 EK-BM.
OJSC «Ural foil», the town of Mikhailovsk, Sverdlovsk region.
Revamping of «Quarto-1800» mill with implementation of HAGCs and gage control system.
PJSC «VSMPO-AVISMA Corporation», the town of Verkhnyaya Salda, the Sverdlovsk region.
The process control system for depiler of finishing train of mill «2000» (rolling shop 16).
PJSC «Asha metallurgical works», the town of Asha, the Chelyabinsk region.
The first stage of revamping of 20-high reversing cold mill Sundwig 720 was successfully completed.
«Vostochny port», the town of Nakhodka, the settlement of Vrangel, Primorski Krai.
Revamping of signaling and interlocking arrangements for tower and trackside equipment of shiploader No.3.
Quality management system audit for conformity with ISO 9001: 2015 (GOST R ISO 9001-2015) requirements
The certification audit took place on the 14th of December, 2017 that proved that CJSC “ASC” quality management system meets the requirements of ISO 9001:2015 (GOST R ISO 9001-2015).
JSC «Kazakhstan aluminium» (Pavlodar aluminium smelter), the town of Pavlodar, Kazakhstan
Upgrading of railway station signaling and interlocking system.