2018


17.10.2018

OJSC «Rosterminalugol», the town of Kingisepp, Leningrad region.

Automatic control system for rail car retarders PH3-2M at two goods sidings no. 6 and no.7.


19.09.2018

JSC «Uralelectromed», «UMMC-Holding», the town of Verkhnyaya Pyshma, Sverdlovsk region.

Extension of the existing field information network OTN.


17.09.2018

JSC «Siberian service company», Krasnoyarsk subsidiary, the city of Krasnoyarsk

The fixed pumping unit with the drives based on frequency converters of CJSC «ASC» make («VARIANT» family) was put into commission.  


12.09.2018

«Vostochny port», the town of Nakhodka, the settlement of Vrangel, Primorski Krai.

Power equipment and process control system for the shiploader No.3 car dumper (the 3rd stage).


14.08.2018

Certificate of partnership from Siemens and ETM companies for WinCC Open architecture (WinCC OA) system.

The certificate confirms relevant competence of CJSC “ASC” and grants the right to use this system in company projects.


10.05.2018

NON-STATE PRIVATE INSTITUTION FOR HIGHER EDUCATION «UMMC Technical university», the town of Verkhnyaya Pyshma, Sverdlovsk region

Fitting out the «Electric power accounting and quality control systems» laboratory with test benches.


27.04.2018

JSC «Siberian service company», Moscow.

Retrofitting of electric drives for main machines and automated control system of drilling rig BU 4500/270 EK-BM.


13.04.2018

OJSC «Ural foil», the town of Mikhailovsk, Sverdlovsk region.

Revamping of «Quarto-1800» mill with implementation of HAGCs and gage control system.


5.03.2018

PJSC «VSMPO-AVISMA Corporation», the town of Verkhnyaya Salda, the Sverdlovsk region.

The process control system for depiler of finishing train of mill «2000» (rolling shop 16).


12.02.2018

PJSC «Asha metallurgical works», the town of Asha, the Chelyabinsk region.

The first stage of revamping of 20-high reversing cold mill Sundwig 720 was successfully completed.


Page 2 of 3123
To other news