2018
8.02.2018
«Vostochny port», the town of Nakhodka, the settlement of Vrangel, Primorski Krai.
Revamping of signaling and interlocking arrangements for tower and trackside equipment of shiploader No.3.
6.02.2018
Quality management system audit for conformity with ISO 9001: 2015 (GOST R ISO 9001-2015) requirements
The certification audit took place on the 14th of December, 2017 that proved that CJSC “ASC” quality management system meets the requirements of ISO 9001:2015 (GOST R ISO 9001-2015).
5.02.2018
JSC «Kazakhstan aluminium» (Pavlodar aluminium smelter), the town of Pavlodar, Kazakhstan
Upgrading of railway station signaling and interlocking system.
29.01.2018
OJSC «Soligalichsky lime integrated works», the village of Turovka, Kostroma region
Automation of shaft furnace with capacity of 240 t/day with the use of pulverized coal.
26.01.2018
OJSC «Rosterminalugol», the town of Kingisepp, Leningrad region.
Automatic control system for car retarders used at non-public railway tracks.
25.01.2018
LLC «Dobryatino quarry management department» (LLC «DKU»), Dobryatino settlement, Vladimir region.
Automated control system for limestone treatment area (furnace plant with gas cleaning).