2022
JSC «Oskolsky electrometallurgical works», the town of Stary Oskol, Belgorod region.
Upgrading of main drive for two-high reversing stand 1000 of mill 700.
AO “Ust-Katav car-building plant”, the town of Ust-Katav, Chelyabinsk region.
In November 2022 the Usk-Katav car-building plant completed delivery of 30 pieces of low-floor tram cars model 71-628-01 that include the traction and support electrical equipment designed and manufactured by CJSC «ASC» for LLC «ChelyabGET».
AO «EVRAZ NTMK», the town of Nizhny Tagil, Sverdlovsk region.
Upgrading of DC converter and control system for main drive of mill stand in heavy section rolling shop at AO «EVRAZ NTMK».
AO «Beloretsk integrated iron and steel works», the town of Beloretsk, Bashkortostan.
Upgrading of electric drives for the first intermediate train (mill stands No.No.S12-S17) based on equipment designed and manufactured by LLC R&D «Saint-Petersburg Electrotechnical Company».
LLC «Sea Port Sukhodol», Primorski Krai, Shkotovo region.
Construction of a new specialized port at the Far East seaside of the Russian Federation. Auxiliary equipment cabinets.
LLC «Sea Port Sukhodol», Primorski Krai, Shkotovo region.
Construction of a new specialized port at the Far East seaside of the Russian Federation. UPS cabinets.
Axle counting sensors ZR at «Smart rail crossing».
Acceptance tests of the pilot facility known as «Smart rail crossing» located in the North Caucasus Railway polygon were successfully completed.
AO «Vostochny port», the town of Nakhodka, the settlement of Vrangel, Primorski Krai.
Upgrading of equipment for stacker No.1 transfer electric drive and PLC S-7 control system for transfer electric drive.
AO «Vostochny port», the town of Nakhodka, the settlement of Vrangel, Primorski Krai.
Updating of uninterruptible power supplies, design and survey activities.
AO «Vostochny port», the town of Nakhodka, the settlement of Vrangel, Primorski Krai.
Dedusting units No.3, 4, 5, 6. Design and survey works, software update.