Power engineering

The specialists of CJSC «ASC» have a long-term experience of work at power generating plants. Numerous activities, including those on upgrade of electric drives and creation of process control systems for machines and processing lines, were undertaken.

The specialists of our company perform upgrading of electric equipment and automation systems for: 

  • Machines of fuel stores and fuel feed systems.
  • Lifting devices.
  • Pulverizing devices.
  • Material dispensing, conveying and unloading systems.
  • Pumping, fan and compressor turbine installations.
  • Water treatment, dedusting and gas cleaning systems.
  • Energy control systems.

 Company Year   Description
PAO Enel-Russia (Public Joint Stock Company), a subsidiary of Sredneuralsk GRES power plant, the Sverdlovsk region. 2024

Local automatic control system for mazut-handling equipment under the project known as «Waste water disposal system for mazut-handling equipment».

PAO Enel-Russia (Public Joint Stock Company), a subsidiary of Sredneuralsk GRES power plant, the Sverdlovsk region. 2024

Production and delivery of equipment.

LLC «Nizhnekamsk heat power plant», the town of Nizhnekamsk, the republic of Tatarstan. 2021

Package of design, erection supervision and commissioning works for equipment of automated control system of denitrification units No. 6, 7, 8 and 9. 

PJSC «Enel-Russia», «Sredneuralsk SDPP» subsidiary, Sverdlovsk region. 2020

.Electric equipment for pumping unit of effluent discharge tank

LLC «Nizhnekamsk central heating and power plant», the town of Nizhnekamsk, the Republic of Tatarstan 2018

Development of working documentation for automated control system of denitrification cells No.8 and No.9.

LLC «Nizhnekamskaya central heating and power plant», the town of Nizhnekamsk, the Republic of Tatarstan 2017

Automated control system for denitrification plants.

CJSC «Severstal», the town of Cherepovets 2017

Production recording system (3D storage yard).

Nizhnekamskaya heat electropower station LLC, Nizhnekamsk, Tatarstan 2016

Automated control system for denitrification plant and monitoring parameters of electrostatic precipitator for power generating units. Equipment manufacture and supply for Alstom Power Stavan CJSC.  

ОАО «Энел ОГК-5», Рефтинская ГРЭС, п. Рефтинский, Свердловская область. 2015

Разработка рабочей документации системы управления рукавными фильтрами энергоблока №2. Изготовление и поставка оборудования.

ОАО «Братский алюминиевый завод», г. Братск, Иркутская область. 2015

Проект системы электроснабжения кремниевых преобразовательных подстанций и распределительных подстанций.