Electrical equipment and systems that were manufactured and put into service during these years address all levels of automation of metallurgical furnaces, press-forging plants, rolling mills, auxiliary production machines, etc., starting from electric drives and transducers and finishing with process control systems and manufacturing execution systems (MES).
Company | Year | Description | |
---|---|---|---|
OOO Amurstal (Limited Liability Company), the town of Komsomolsk-on-Amur, the Khabarovsk Territory. | 2025 | Modernization of electrical equipment for the finishing line of bar-rolling mill shop – stage II. |
|
ООО VIZ-Steel (Limited Liability Company), the city of Ekaterinburg. | 2025 | Modernization of control system, units and mechanisms of recrystallization annealing plant No.1. |
|
PAO NLMK (Public Joint Stock Company), the town of Lipetsk. | 2025 | Upgrading the zinc coating control system. |
|
OOO PromSort-Kaluga (Limited Liability Company), the village of Vorsino, the Kaluga region. | 2025 | «Upgrading the control system for point operating mechanisms (deviators) of rolling mill». |
|
OOO VIZ-Stal (Limited Liability Company), the city of Ekaterinburg. | 2024 | Reconstruction of insulating coating plants No.3,4,5,7. Development of technical documentation, delivery, supervision of erection, commissioning activities and warranty tests, engineering-advisory services. |
|
AO Taganrog metallurgical plant (Joint Stock Company), Rostov region, the city of Taganrog. | 2024 | Integration of data gathering and monitoring system (software product Winnum) and process control system «PIMS» in tube rolling shop of AO TAGMET (Joint Stock Company). |
|
PAO NLMK (Public Joint Stock Company), the town of Lipetsk. | 2024 | Dynamo steel shop. Retrofitting and upgrading of protective coating plant No.2. |
|
PAO NLMK (Public Joint Stock Company), the town of Lipetsk. | 2024 | Dynamo steel shop. Installation of welding machine into process-related calcining and coating line. |
|
PAO NLMK (Public Joint Stock Company), the town of Lipetsk. | 2024 | Delivery of equipment under the project named «Flat cold-rolled products shop. Slitting line No.10. Modernization of control system». |
|
PAO NLMK (Public Joint Stock Company), the town of Lipetsk. | 2024 | Production and delivery of equipment for dynamo steel shop, continuous pickling line, electrical room. Exit end. |