Electrical equipment and systems that were manufactured and put into service during these years address all levels of automation of metallurgical furnaces, press-forging plants, rolling mills, auxiliary production machines, etc., starting from electric drives and transducers and finishing with process control systems and manufacturing execution systems (MES).
| Company | Year | Description | |
|---|---|---|---|
| JSC «Oskolsky electrometallurgical works», the town of Stariy Oskol, Belgorod region. | 2018 | DC drive control systems for a two-high reversing mill stand roller table in hot rolling mill area of long product rolling plant. |
|
| LLC «VIZ-Stal», the city of Ekaterinburg. | 2018 | Replacement of control system and management of continuous and accurate tension fixing on coilers of decarburization annealing plant-4B. |
|
| PJSC «Asha metallurgical works», the town of Asha, the Chelyabinsk region. | 2018 | The first stage of revamping of 20-high reversing cold mill Sundwig 720 was successfully completed. |
|
| JSC «Metallurgical works «ELECTROSTAL», the town of Electrostal, Moscow region | 2017 | Automatic strip gage control system. |
|
| OJSC «Tulachermet», the town of Tula. | 2017 | ||
| OJSC «Tulachermet», the town of Tula. | 2017 | Furnace plant automated control system for a limekiln department. |
|
| JSC «Vyksa smelter», the town of Vyksa, Nizhny Novgorod region. | 2017 | Retrofitting of circular heating furnace in wheel-rolling shop. |
|
| SMS Group GmbH, Germany | 2017 | Software testing with the aid of 3D model. |
|
| JSC «Beloretsk iron and steel works» , the town of Beloretsk, Bashkortostan. | 2016 | Revamp of electric equipment for drives of roughing train of mill «150». |
|
| Gazpromtrubinvest OJSC, Volgorechensk Pipe Plant, Volgorechensk, Kostroma region | 2016 | Commissioning of automated transfer line in the medium diameter pipe complex. |
