Electrical equipment and systems that were manufactured and put into service during these years address all levels of automation of metallurgical furnaces, press-forging plants, rolling mills, auxiliary production machines, etc., starting from electric drives and transducers and finishing with process control systems and manufacturing execution systems (MES).
Company | Year | Description | |
---|---|---|---|
PAO «Severstal», the town of Cherepovets | 2020 | Updating of process control system for radial double-strand steel continuous casting plant No.5. |
|
LLC «VIZ-Steel», the city of Ekaterinburg. | 2020 | Updating of control system for entry and exit sections of straightening annealing plant No.7. |
|
LLC «VIZ-Steel», the city of Ekaterinburg. | 2020 | Updating of control system for recrystallization annealing plants No.1 and No.2. |
|
LLC «VIZ-Steel», the city of Ekaterinburg. | 2020 | Updating of control system for decarburizing annealing plant 1A. |
|
PJSC «NLMK», the town of Lipetsk. | 2020 | Updating of control system for continuous pickling line. |
|
PJSC «Novolipetsk integrated iron-and-steel works», the town of Lipetsk. | 2020 | Retrofit of hydrogen station control system. |
|
PAO «Seversky Tube Works», the town of Polevskoy, the Sverdlovsk region. | 2020 | The works on putting the equipment of a new tube heat treatment line into industrial operation were finished in tube rolling shop No. 1. |
|
PJSC «NLMK», the town of Lipetsk. | 2020 | Updating of control system for protective coating plant No.1. |
|
LLC «Tagil steel», the town of Nizhny Tagil, Sverdlovsk region. | 2020 | Electric drives and process control systems for welded pipe production TESA 254. |
|
JSC «EVRAZ NTMK», the town of Nizhny Tagil, Sverdlovsk region | 2020 | Revamping of DC converters for main drives of prefinishing trains GUK2 and VK2 of universal beam mill in a wide-flange beam rolling shop. |