Electrical equipment and systems that were manufactured and put into service during these years address all levels of automation of metallurgical furnaces, press-forging plants, rolling mills, auxiliary production machines, etc., starting from electric drives and transducers and finishing with process control systems and manufacturing execution systems (MES).
| Company | Year | Description | |
|---|---|---|---|
| PJSC «NLMK», the town of Lipetsk. | 2021 | Updating of control system for protective coating plant No.2. |
|
| OJSC Severstal — Metiz, Cherepovets. | 2021 | Addressed product accounting system «3D warehouse». Putting into commercial operation. |
|
| OJSC Severstal — Metiz, Cherepovets. | 2021 | Process parameter control system (dispatch system). |
|
| PAO «Severstal», the town of Cherepovets | 2020 | Updating of process control system for radial double-strand steel continuous casting plant No.5. |
|
| LLC «VIZ-Steel», the city of Ekaterinburg. | 2020 | Updating of control system for entry and exit sections of straightening annealing plant No.7. |
|
| LLC «VIZ-Steel», the city of Ekaterinburg. | 2020 | Updating of control system for recrystallization annealing plants No.1 and No.2. |
|
| LLC «VIZ-Steel», the city of Ekaterinburg. | 2020 | Updating of control system for decarburizing annealing plant 1A. |
|
| PJSC «NLMK», the town of Lipetsk. | 2020 | Updating of control system for continuous pickling line. |
|
| PJSC «Novolipetsk integrated iron-and-steel works», the town of Lipetsk. | 2020 | Retrofit of hydrogen station control system. |
|
| PAO «Seversky Tube Works», the town of Polevskoy, the Sverdlovsk region. | 2020 | The works on putting the equipment of a new tube heat treatment line into industrial operation were finished in tube rolling shop No. 1. |
